Learning Curve Tool
This tool performs a quick learning curve calculation. Given the theoretical first unit cost (in dollarss), the total quantity of units to be produced, and the learning curve slope (LCS), the calculator returns the cumulative average unit cost for the lot and the cost of the Nth unit (where N = X). The learning curve slope is the percentage decrease in cost experienced every time X doubles. Therefore the LCS must be a value between 0 and 1 in order to get correct output. Note that the calculator goes to two decimal places, so if the LCS is extremely low, it is possible to get a 'Nth unit cost' of $0.
S Curve Tool
This tool generates a yearly outlay profile for a specified program budget. The outlay, in this instance, is generated by the cumulative distribution function (CDF) for the Weibull distribution. The formula for the Weibull CDF is
where 't' = time in years, 'alpha' is the scaling parameter, and 'beta' is the shape parameter. A few illustrative examples are provided so the user can graphically see the output for several alpha and beta combinations. The x-axis is time (showing 0 to 10 years) and the y-axis is f(t) on a scale from 0 to 1. Note that depending upon the alpha and beta values, a yearly profile outlay could extend for a relatively short duration (3 years for alpha = 4, beta = 2) or a longer duration (greater than 10 years for alpha = 0.5, beta = 2).
| alpha | beta | Corresponding Outlay Profile |
| 0.5 | 2 | ![]() |
| 1 | 2 | ![]() |
| 2 | 2 | ![]() |
| 4 | 2 | ![]() |
| 0.5 | 4 | ![]() |
| 1 | 4 | ![]() |
| 2 | 4 | ![]() |
| 4 | 4 | ![]() |
While the illustrative examples give an idea of how the Weibull distribution is used to generate potential outlay profiles, it is useful to see how well the process can approximate real world data. The table below presents the "Outlay Rates to be Used for Incremental Changes in BA Purchases" from Table 5-11 of the National Defense Budget Estimates for FY2012. For each line of data in the table, the 'best fit' alpha and beta values were derived using the least squares methodology. The user can take those 'best fit' alpha and beta values, use them as input for the S Curve Tool, and see how closely the Tool output matches the FY12 outlay rates.
| FY12 Outlay Rates* | 'Best Fit' Derivations | ||||||||
| Category | Yr1 | Yr2 | Yr3 | Yr4 | Yr5 | Yr6 | alpha | beta | |
| Military Personnel | |||||||||
| Army | 0.753 | 0.198 | 0.050 | 1.087 | 0.739 | ||||
| Navy | 0.883 | 0.100 | 0.018 | 0.894 | 0.427 | ||||
| Marine Corps | 0.809 | 0.145 | 0.046 | 0.881 | 0.569 | ||||
| Air Force | 0.836 | 0.138 | 0.026 | 0.991 | 0.553 | ||||
| Operation & Maintenance | |||||||||
| Army | 0.376 | 0.540 | 0.037 | 0.019 | 0.017 | 0.012 | 2.560 | 1.314 | |
| Navy | 0.532 | 0.385 | 0.047 | 0.021 | 0.016 | 1.814 | 1.147 | ||
| Marine Corps | 0.306 | 0.538 | 0.083 | 0.052 | 0.009 | 0.012 | 2.448 | 1.457 | |
| Air Force | 0.458 | 0.457 | 0.041 | 0.025 | 0.009 | 0.010 | 2.159 | 1.231 | |
| Procurement | |||||||||
| Army Aircraft | 0.110 | 0.400 | 0.298 | 0.150 | 0.022 | 0.020 | 2.301 | 2.307 | |
| Army Missiles | 0.083 | 0.420 | 0.325 | 0.140 | 0.020 | 0.012 | 2.525 | 2.282 | |
| Navy Aircraft | 0.150 | 0.400 | 0.286 | 0.100 | 0.045 | 0.019 | 2.170 | 2.184 | |
| Navy Weapons | 0.220 | 0.320 | 0.270 | 0.120 | 0.035 | 0.035 | 1.726 | 2.284 | |
| Air Force Aircraft | 0.070 | 0.400 | 0.280 | 0.140 | 0.080 | 0.030 | 2.255 | 2.396 | |
| Air Force Missiles | 0.300 | 0.310 | 0.250 | 0.080 | 0.038 | 0.022 | 1.496 | 2.038 | |
| RDT&E | |||||||||
| Army | 0.010 | 0.355 | 0.280 | 0.230 | 0.100 | 0.025 | 2.343 | 2.805 | |
| Navy | 0.050 | 0.455 | 0.300 | 0.150 | 0.030 | 0.015 | 2.566 | 2.242 | |
| Air Force | 0.050 | 0.408 | 0.330 | 0.160 | 0.032 | 0.020 | 2.569 | 2.376 | |
| * Source: National Defense Budget Estimates for FY2012 | |||||||||
The S Curve Tool has three input fields: Budget ($M), alpha, and beta. The Tool spreads the Budgeted amount across the years based upon the Weibull CDF function and the values that the user inserts for the alpha and beta parameters. In addition to the yearly outlay profile, the output also includes the CDF value and the "% of the Total Budget" for each year. To give an example of how the 'Best Fit' Derivations can be tested, consider the Military Personnel - Army in the first row. Regardless of what the user inputs for the Budget, inputting alpha = 1.087 and beta = 0.739 should lead to the CDF and "% of Total Budget" fields in the output approximating the values in the FY12 Outlay Rates columns. It is left to the user to do the comparison.
Note that the output values are all rounded. That is why a "% of Total" value may appear as '0' while the Budget ($M) has a value in it.
Also, the approximations sometimes have "tails" that extend substantially beyond the exact FY12 Outlay Rates, but they are usually very small dollar amounts.
Inflation Tool
This tool performs a quick inflation calculation. Given the base year dollar value, the assumed inflation rate, and the number of years to which the rate gets applied, the resulting out year dollar value is provided. The inflation multiplication factor is shown as well.